Goal: Using Excel to build time series under discrete-time Solow Model.
Please click on the linkages, you'll find the corresponding xls files showing each steps except after step 8.
Step0: In this step, we just build the frame of the table that's we are gonna work on.
Step1: In this step, we build the time series from 0 to 40.
Step2: In this step, we build the technology series from time 0 to time 40.
Step3: In this step, we build k(0) and y(0).
Step4: In this step, we build k(1).
Step5: In this step, we bid to build the whole k(t).
Step7: In this step, we build the series for % change in k(t) and % change in y(t).
Step8: Please build the time series but up to time period 150 and observe the % change in k(t) and % change in y(t) in the end of the series.